How Long Does It Really Take to Build an ADU From Start to Finish?

Home » Blog » How Long Does It Really Take to Build an ADU From Start to Finish?

So picture this. You are standing in your backyard, coffee in hand, looking at all that empty space. And the thought pops up… “An ADU would be perfect here.” Extra income. Space for family. A home office that is not your dining table.

Then reality hits.

“How long is this actually going to take?”

If you are already talking to ADU builders in Santa Rosa, you are probably hearing different answers. Some say fast. Some say slow. Truth is… it depends. But let us break it down in a real, no-pressure way.

The Planning Part Comes First (And It Is Slower Than You Think)

Before anything gets built, there is planning. This is where ideas turn into drawings. And budgets. And a few late-night changes because suddenly you want bigger windows.

Planning usually takes one to three months. Sometimes more. Not because people are slow, but because decisions take time. You are building a small home, after all.

California has made ADUs easier since 2020. That helped a lot. According to the California Department of Housing and Community Development, ADU permits have more than doubled in recent years. That means cities are used to these projects now. Less confusion. Fewer surprises.

Still, this stage matters. Rushing here often causes delays later. And nobody wants that.

Permits… Yeah, This Is the Part Everyone Dreads

Let us talk permits. Not fun. But necessary.

By law, California cities must review complete ADU permit applications within 60 days. Santa Rosa follows that rule. That sounds quick, right?

In real life, permits usually take one to two months. If plans are clear, it moves faster. If something is missing, it slows down.

This is where working with people who know the local process helps. They already know what the city looks for. That saves time. And stress.

Construction Begins (Finally Something to Watch)

Once permits are approved, things start to feel real.

Construction for most ADUs takes four to six months. Garage conversions are often quicker. Detached units take a bit longer.

A 2022 Freddie Mac study found that the average ADU construction time in the U.S. was just over six months. California projects often fall right in that range.

Some weeks feel fast. Others feel slow. Weather, inspections, and material delays can all pop up. It is normal. No build goes perfectly smooth. Anyone who says otherwise is lying.

Inspections and Final Approval

As the build wraps up, the city checks everything. Electrical. Plumbing. Structure. Final walk-through.

This stage usually takes two to four weeks. Sometimes it feels like waiting for a package that says “out for delivery” all day.

Once it is approved, that is it. The ADU is ready to use.

So… What Is the Real Timeline?

Let us add it all up.

  • Planning and design: 1 to 3 months
  • Permits: 1 to 2 months
  • Construction: 4 to 6 months
  • Final inspections: about 1 month

That puts most ADU projects at 7 to 12 months total.

Not overnight. But not forever either.

Why the Right Team Makes a Big Difference

Most delays do not come from building walls. They come from paperwork, planning mistakes, or miscommunication.

That is why experienced ADU builders Santa Rosa matter. They know the rules. They know the process. And they help things move without cutting corners.

Building an ADU takes patience. But when it is done, you have something solid. Something useful. Something that adds real value.

And honestly… once you know what to expect, the whole thing feels a lot less scary.